離岸風電佈纜工程及維運服務

OFFSHORE WIND POWER CABLE INSTALLATION AND MAINTENANCE SERVICES

我們擁有為離岸風電佈纜工程及維運服務而設計的海洋工程船及人員編組,並將依業務推展計畫擴編,船上建置有先進的起重設備和相關技術,能夠應對離岸風電機組的維護和修復工作。此外,我們還配備了高精度定位系統和數位地圖,以確保船隻能夠準確地定位和操作,並且保持安全距離。

在電纜電線海底佈建方面,我們的工程船擁有高科技的佈線系統和配套的工程團隊,能夠應對各種海底地形和水深環境的挑戰,並備有遠程操縱系統和高精度測量設備,以確保佈建過程中的準確性和安全性。

工程船也配置各種檢測和維護設備,包括無損檢測設備和儀器,以及相關的維護工具和備件。我們的工程團隊擁有專業的知識和經驗,能夠進行各種維護和修復工作,並且保證在最短的時間內完成任務,並確保在各種情況下的準確性、安全性和效率。

We possess a fleet of marine engineering vessels specifically designed for offshore wind farm cabling projects and maintenance services. We have assembled a skilled team of personnel to support these operations, and we plan to expand our capabilities as part of our business development initiatives. Our vessels are equipped with state-of-the-art lifting equipment and related technologies to effectively address maintenance and repair tasks for offshore wind turbine systems. Furthermore, we have incorporated high-precision positioning systems and digital maps to ensure accurate vessel positioning, operation, and adherence to safety distances.

In the field of submarine cable laying, our engineering vessels feature cutting-edge cabling systems and a dedicated team of professionals. They are capable of addressing the challenges posed by various seabed terrains and water depths. Our vessels are equipped with remote control systems and high-precision measurement devices to ensure accuracy and safety throughout the cable laying process.

Our engineering vessels are also equipped with various inspection and maintenance equipment, including non-destructive testing devices and instruments, along with relevant maintenance tools and spare parts. Our engineering team possesses specialized knowledge and experience to carry out various maintenance and repair tasks, ensuring the completion of missions within the shortest possible time while maintaining accuracy, safety, and efficiency in diverse circumstances.


(上)現役海洋工作船,2008 年。
(下) 2023 年在馬來西亞建造,多用途海洋工作船,配備 5,000 噸容量的 DP2 電纜轉盤系統和 8 點系泊系統,以及配備了埋深達 3.9 米的大功率雪橇/犁和 100 噸主動甲板起重機,尚未完工。

(Above) Active marine work vessel, built in 2008.
(Below) Under construction in Malaysia in 2023, a multi-purpose marine work vessel equipped with a 5,000-ton capacity DP2 cable carousel system, an 8-point mooring system, and a high-power plough/sled with a burial depth capability of up to 3.9 meters. It also features a 100-ton active deck crane. The construction is still ongoing.